E355 En10305 Seamless Pipe Ck45 Shock Absorber Hydraulic Honed Steel Tube for Auto Parts
HomeHome > Products > Shock Absorbor Tube > E355 En10305 Seamless Pipe Ck45 Shock Absorber Hydraulic Honed Steel Tube for Auto Parts
E355 En10305 Seamless Pipe Ck45 Shock Absorber Hydraulic Honed Steel Tube for Auto Parts

E355 En10305 Seamless Pipe Ck45 Shock Absorber Hydraulic Honed Steel Tube for Auto Parts

Q: Why choose us? A: Our company have been in steel business for more than ten years, we are internationally experienced
Basic Info
Model NO. as required
Usage Pipeline Transport, Boiler Pipe, Hydraulic/Automobile Pipe, Oil/Gas Drilling, Food/Beverage/Dairy Products, Machinery Industry, Chemical Industry, Mining, Construction & Decoration, Special Purpose
Section Shape Round
Transport Package Standard
Specification as required
Trademark PANJIN
Origin Shandong
HS Code 7304111000
Production Capacity 50, 000 Tons/Year
Product Description

E355 En10305 Seamless Pipe Ck45 Shock Absorber Hydraulic Honed Steel Tube for Auto Parts

E355 En10305 Seamless Pipe Ck45 Shock Absorber Hydraulic Honed Steel Tube for Auto Parts

E355 En10305 Seamless Pipe Ck45 Shock Absorber Hydraulic Honed Steel Tube for Auto Parts

TypeSeamless carbon steel pipe / Line Pipe
MaterialsAPI 5L /A53 /A106 GRADE B and other material which client inquired
SizeOuter DiameterSeamless:17-914mm 3/8"-36"
Wall ThicknessSCH10 SCH20 SCH30 STD SCH40 SCH60 XS SCH80
SCH100 SCH120 SCH140 SCH160 XXS
LengthSingle random length/Double random length
5m-14m,5.8m,6m,10m-12m,12m or as customer's actual request
EndsPlain end/Beveled,protected by plastic caps on both ends, cut quare,grooved,threaded and coupling,etc.
Surface TreatmentBare,Painting black,varnished,galvanized,anti-corrosion 3PE PP/EP/FBE coating
Technical MethodsHot-rolled/Cold-drawn/Hot-expanded
Testing MethodsPressure test,Flaw detection,Eddy current testing, Hydro static testing or Ultrasonic examination and also with chemical and
physical property inspection
PackagingSmall pipes in bundles with strong steel strips,large pieces in loose; Covered with plastic woven
bags; Wooden cases;Suitable for lifting operation;Loaded in 20ft 40ft or 45ft container or in bulk;
Also according to customer's requests
OriginChina
ApplicationConveying oil gas and water
Third Party InspectionSGS BV MTC
Trade TermsFOB CIF CFR
Payment TermsFOB 30%T/T,70% before shipment
CIF 30% pre-payment and the balance to be paid before making shipment
or Irrevocable 100% L/C at sight
MOQ10 tons
Supply Capacity5000 T/M
Delivery TimeUsually within 10-45 days after receipt of advance payment

E355 En10305 Seamless Pipe Ck45 Shock Absorber Hydraulic Honed Steel Tube for Auto Parts

E355 En10305 Seamless Pipe Ck45 Shock Absorber Hydraulic Honed Steel Tube for Auto Parts

Q: Why choose us?
A: Our company have been in steel business for more than ten years, we are internationally experienced, professional, and we can provide variety of steel products with high quality to our clients.

Q: Can provide OEM/ODM service?
A: Yes. Please feel free to contact us for more details discuss.

Q: How is your Payment Term?
A:One is 30% deposit by TT before production and 70% balance against copy of B/L; the other is Irrevocable L/C 100% at sight.

Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case.

Q: Can you provide sample?
A: Yes, for regular sizes sample is free but buyer need to pay freight cost.

Q: How long is your delivery time?
A: Our daily inventory is more than 8000 tons, so for common product size, just need 5 days from stocks; if the special size from new production, delivery 20-30 days.